Projects
Project Number 1522
Location: New Jersey
Project Type: EVCS Level 2
Project consisted of installing (3) Dual Port 40A BTC Stations for 6 parking spots. AmperEVcharging collaborated with client on providing engineering design for EVCS Installation project. Client had provided field data collection and the EVCS equipment to be installed at site. The design is to bring power to the EVCS fed from an existing panel. In the consultancy stage, AmperEVcharging will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers and issue PE stamped engineering design. The EV charging station will not only provide and excellent display of EV Installation, but will enable electric vehicle owners to recharge their vehicles at dedicated and visible EV parking spaces for vehicles. AmperEVcharging streamlined solutions will save you time and money and ensure code compliance. Contact us today for free consultation and quote.
Project Number 1495
Location: New Jersey
Project Type: EVCS Level 2
AmperEVcharging has partnered with client and completed the design of (4) Level 2 Charging Stations located at business building’s reserved car parking garage. The Design is to provide power to the (4) Juicebox Pro 40 charging station attached to a wall fed from an existing panel. In the consultancy stage, AmperEVcharging will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers and issue PE stamped engineering design. This works well, where people or employees may need to replenish their vehicle’s power after a long drive while going about their business and brings an added level of power security. AmperEVcharging streamlined solutions will save you time and money and ensure code compliance. Contact us today for free consultation and quote.Modulate Battery Swapping Station
Project Number 1538
Location: California
Project Type: Modular Battery Swapping Station
AmperEVcharging collaborated with client on providing engineering design for the installation of (2) battery swapping station at commercial lot. Engineering Design includes providing power to the (2) stations fed from a utility owned pad mounted transformer & station’s structural detail. AmperEVcharging had reviwewed the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers, provide structural detail & engineering report of the station anchorage and issued PE signed and stamped engineering design. Modular Battery Swapping is a new way to deliver energy to any electric vehicle. It can deliver 100% charged battery to any EV in under 5 minutes. It’s cheaper to build, cheaper to install and fully automated. AmperEvcharging streamlined solutions will save you time and money and ensure code compliance. Contact us today for free consultation and quote.
Project Number 1583
Location: California
Project Type: Modular Battery Swapping Station
AmperEVcharging collaborated with the client to do Engineering Design for Modular Battery Swapping Station Project located at a vacant space facing to a commerical building. The Engineering Design is to provide power to the (2) stations. The power source is fed from existing utility pad mounted transformer. Then it will distribute to a new 150kVA, 480/277V, 3 ph pad mounted transformer, meter main & ct cabinet and a panelboard where the (2) stations will be connected, issued PE signed and stamped engineering design. AmperEvcharging also provide the station’s structural detail & engineering report. Modular Battery Swapping is a new way to deliver energy to any electric vehicle. It can deliver 100% charged battery to any EV in under 5 minutes. It’s cheaper to build, cheaper to install and fully automated.
Project Number 1562
Location: California
Project Type: Modular Battery Swapping Station
AmperEVcharging participated in the proposed Modular Battery Swapping Station Project located at Oakland, California. AmperEvcharging did the the engineering design related to electrical & structural. The engineering design is to provide power to (3) stations, where power source is fed from existing utility pad mounted transformer. Then it will distribute to a new main disconnect, meter main & ct cabinet and a panelboard where the (2) stations will be connected, issued PE signed and stamped engineering design and provide the station’s structural detail & engineering report. Modular Battery Swapping is a new way to deliver energy to any electric vehicle. It can deliver 100% charged battery to any EV in under 5 minutes. It’s cheaper to build, cheaper to install and fully automated.
Project Number 1559
Location: Arizona
Project Type: Level 2 Charging Station
AmperEVcharging has partnered with client and work the engineering design for the installation of (3) Level-2 Charging Stations located in front of leasing office. The Design is a mixed-used charging that offer share charging between public and residents and CT4000 dual port pedestal charging station is considered in the project. In the consultancy stage, AmperEVcharging will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers, in this case it is fed from existing pad mounted transformer. After completing the engineering design, AmperEVcharging PE signed & sealed and issued for approval to obtain local AHJ permit.
Project Number 1029
Location: Arizona
Project Type: Level 2 Charging Station
AmperEVcharging has partnered with client and work the engineering design for the installation of (3) Level-2 Charging Stations located in front of leasing office. The Design is a mixed-used charging that offer share charging between public and residents and CT4000 dual port pedestal charging station is considered in the project. In the consultancy stage, AmperEVcharging will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers, in this case it is fed from existing pad mounted transformer. After completing the engineering design, AmperEVcharging PE signed & sealed and issued for approval to obtain local AHJ permit.
Project Number 1031
Location: Pennsylvania
Project Type: EVCS Level 2
AmperEVcharging had teamed up with Client to do the engineering design of (2) Level-2 electric vehicle charging stations to be installed in a commercial parking lot. AmperEvcharing will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers. The power source of the (2) stations is fed from existing panel located inside the commercial facility. With increasing EV owners and the demand for stations, the station can be programmed, updated and repurposed for the needs of the time. After completing the engineering design, AmperEVcharging will PE stamped, signed & sealed and issued for approval to obtain local AHJ permit.
Project Number 1035
Location: New Jersey
Project Type: EVCS Level 2
AmperEVcharging had teamed up with Client to do the engineering design of (2) electric vehicle charging stations to be installed in a public parking lot. AmperEvcharing will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers. The power source of the (2) stations will be fed to new outside service with new utility meter and panelboard dedicated to the EV charging stations. After completing the engineering design, AmperEVcharging PE signed & sealed and issued for approval to obtain local AHJ permit.
Project Number 1095
Location: New Jersey
Project Type: EVCS Level 2
AmperEVcharging had worked together with Contractor to do the engineering design of (4) Clipper Creek EV charging stations to be installed in a public parking lot. AmperEvcharing will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers. the design is to install new(1) 45kVA transformer & 208V 125A panel to be fed from existing panel. From new panel, power will be distributed to the (4) EV charging stations via 1 1/4″ conduit run & #6 AWG CU THWN wiring from panel to exterior wall penetration, and trench to junction box in ground and then to station location.There will be (2) sets of Dual EV Charging stations. After completing the engineering design, AmperEVcharging will PE signed & sealed and issued for approval to obtain local AHJ permit.