Project #1544

Overview

Project No. :

#1544

Project Type :

EV AC Charger Dual Port

Location :

Georgia

Project Description

The project involves installing four (4) EV charging stations mounted on two (2) dual-port pedestals, enabling simultaneous charging for multiple vehicles. These stations will be positioned to maximize space efficiency while ensuring ease of access for EV users. The dual-port design allows for optimized power distribution, reducing strain on the electrical system through intelligent load management. Installation will include panel upgrades, conduit routing, and protective enclosures to ensure long-term reliability. All work will comply with NEC Article 625 and relevant local electrical standards for safe and efficient operation.