Project #2013A

Overview

Project No. :

#2013A

Project Type :

EVCS Level 2

Location :

Washington

Project Description

Install four (4) EverCharge Level 2 electric vehicle (EV) charging stations, along with all requisite electrical infrastructure, within the designated indoor parking stalls located adjacent to the electrical room. Scope of work includes conduit runs, wiring, circuit breakers, mounting hardware, and necessary load management components to ensure optimal system performance and compliance with applicable electrical codes. Integration with existing power distribution systems will be executed to maintain electrical load balance and prevent overcurrent conditions. All installations will adhere to NEC, local jurisdictional codes, and manufacturer specifications for safety and efficiency. Final commissioning will include system testing, verification of proper functionality, and network connectivity as required.