Project #1551

Overview

Project No. :

#1551

Project Type :

EVCS Level 2 Dual Port

Location :

Arizona

Project Description

The project involves installing three (3) CT4000 Level 2 dual-port EV chargers, providing six charging connectors to accommodate multiple electric vehicles simultaneously. These chargers will be strategically placed within the existing parking lot, ensuring convenient access for EV users while maintaining traffic flow and parking efficiency. The CT4000 series features network connectivity, load balancing, and smart charging capabilities, optimizing energy usage and reducing peak demand. The installation will include dedicated electrical circuits, conduit runs, and proper grounding, ensuring compliance with NEC Article 625 and local utility regulations.