#1029
EVCS Level 3
Virginia
This is a Level 3 Electric Vehicle Charging Station (EVCS) project. It consists of (3) Level 3 DC Fast Charging (DCFC) electric vehicle charging stations to be installed at outside Tysons Galleria parking lot and all related electrical activities. The design is to provide power to the (3) EVCS. AmperEVcharging will review the distribution network operators, the necessary electrical demand, power source verification from existing building electrical room or new transformers. DCFC #23 & #24 ac power supply will be fed from new 400A, 480V Panel, located at existing electric room #5 and DCFC #22 ac power supply will be fed from new 200A, 480V Panel, located at existing electric room #8. After completing the engineering design, AmperEVcharging PE signed & sealed and issued for approval to obtain local AHJ permit.
Copyright © 2024 AmperEVCharging | Powered By Amper Engineering PC
Soliciting as Amper Engineering PC in NJ and sole practitioner in the remaining states